Hoosac Valley Middle/High School

Cheshire, MA

  • Project Type: Public School: Power Purchase Agreement

  • System Size: 495 kW

  • System Type: Fixed Tilt Ground Mount

    The project was completed on schedule in 9 months, including all permitting, interconnection approvals, design, construction and commissioning. Construction was performed within 100 feet of an occupied school without disruption to the students. The system was aesthetically incorporated into the natural slope of the land.