Hoosac Valley Middle/High School
Cheshire, MA
Project Type: Public School: Power Purchase Agreement
System Size: 495 kW
System Type: Fixed Tilt Ground Mount
The project was completed on schedule in 9 months, including all permitting, interconnection approvals, design, construction and commissioning. Construction was performed within 100 feet of an occupied school without disruption to the students. The system was aesthetically incorporated into the natural slope of the land.